PLANNING GUIDE · GREATER ATLANTA
Plan a master bathroom in eight phases: define the goal, measure the room, set a budget and contingency, choose a layout, select finishes, verify your contractor, confirm permits, and prepare for demolition and closeout.
Request a labor quote
Work through the phases in order: measurements support the plan, the plan shapes the budget, and early selections prevent delays. The same sequence works for a hall bath, with less storage and lighting work.
How to read these prices: Figures below are total-project planning estimates for combined labor and materials, not Prudencio labor quotes. Homeowners purchase all materials; Prudencio can help with selections and provides labor-only proposals. Actual costs vary with condition, layout and finishes.
For a 5×8 bathroom, plan approximately $7,000–$11,000 for a cosmetic update, $12,000–$21,000 for a full gut, or $21,000–$32,000 for a premium package with layout changes, curbless entry, heated floor and glass. Broad full renovations run $14,000–$34,000. These are combined labor-and-materials planning ranges, not Prudencio labor-only quotes.
See the 5×8 cost breakdown →Start with the problems you want to solve. Then work through each phase before the next decision depends on it.
☐ List what fails today: storage, counter space, shower size, lighting, ventilation, privacy or an unused tub.
☐ Describe the finished room and who uses it.
☐ Separate must-haves from wants and price each want.
☐ Decide whether the layout stays; moving a toilet or drain changes cost and schedule.
☐ Choose tub, shower or both, and whether curbless entry matters now or later.
☐ Consider accessibility needs over the next ten years.
☐ Sketch the floor plan: wall-to-wall dimensions, ceiling height and exact tub or shower alcove size.
☐ Measure door and window positions, swing and clearance.
☐ Photograph every wall, ceiling, floor and inside the vanity cabinet.
☐ Locate main and fixture shutoffs, GFCI receptacles and exhaust fan.
☐ Note whether the floor is on a slab, over a crawl space or over a finished room; this affects drain moves.
☐ Record water-damage signs such as staining, soft drywall, loose tile or a ceiling stain below.
☐ Set a total you can spend without touching an emergency fund.
☐ Reserve roughly 15–20% for hidden conditions revealed in an older bathroom.
☐ Plan to purchase all materials yourself; Prudencio helps with selection and quotes labor only.
☐ List labor proposal inclusions and exclusions in writing.
☐ Reserve money for glass; a frameless enclosure is often quoted separately.
☐ Confirm which walls are load-bearing before planning removal.
☐ Decide whether the toilet moves: a slab can require concrete cutting; access over a crawl space is usually simpler.
☐ Size the shower and decide on a bench, niche and curb or curbless entry.
☐ Check the door clears the vanity and drawers open past the toilet.
☐ Plan lighting and an exhaust fan ducted outside rather than into the attic.
☐ Mark the layout on the floor with tape and walk it for a week.
☐ Choose floor tile for wet-area slip resistance; DCOF 0.42 or higher is a usual benchmark for bathroom floors.
☐ Choose wall and shower tile, grout and sealant; verify stock or lead times.
☐ Pick the valve and trim, shower head and drain before rough-in because the valve body goes in the wall.
☐ Choose vanity, top, sink, faucet, toilet, mirror and lighting.
☐ Get quantities and order 10–15% extra for cuts and breakage.
☐ Check tile deliveries for broken boxes and matching dye lots.
☐ Check the Georgia residential contractor license with the state licensing board.
☐ Request current general liability and workers’ compensation insurance certificates.
☐ Compare two or three written proposals for the same scope.
☐ Ask who will be on site and whether the owner is present.
☐ Confirm in writing who pulls and pays for permits.
☐ Review a payment schedule tied to completed phases rather than the calendar.
☐ Ask the authority having jurisdiction whether the scope needs a permit; plumbing or electrical moves, shower rebuilds and layout changes may require one.
☐ Confirm required inspections and when they happen.
☐ Check HOA or condo review and work-hour rules.
☐ Confirm bathroom GFCI protection and an exhaust fan sized for the room.
☐ Keep approved plans and inspection records with the project file.
☐ Empty the room, medicine cabinet and closet.
☐ Protect adjacent floors and furniture; plan dust containment with plastic sheeting and a zipper door.
☐ Arrange another bathroom or a temporary plan before demolition.
☐ Confirm delivery dates and material storage.
☐ Approve changes in writing before work proceeds.
☐ Walk the finished room with a level, run every fixture and check the ceiling below for leaks.
☐ Collect the written warranty, grout and stone care instructions, and final invoice.
Demolition is a point of no return. Settle these decisions and, where possible, have materials on site before day one.
Fix fixture positions, shower size, door swing and any wall move. Choose, order, receive and inspect tile and grout, including the floor tile’s slip rating.
Agree on the waterproofing method—presloped liner or bonded membrane—and curbless details. Plan fan location and ducting, GFCI receptacles, lighting and any heated-floor circuit. Choose framed or frameless, hinged or sliding glass so wall blocking can be planned.
Set the contingency, agree on the payment schedule and arrange parking and a dumpster.
Match each decision to the point in the project when it needs to be resolved.
Special-order lead times, dye lots and pattern direction affect layout and drain position. Decide before the contract is signed.
Moving a drain or valve can reopen rough-in and require another inspection. Decide before rough-in begins.
A frameless panel is measured after tile and made to order, but blocking must be framed earlier. Decide before tile is ordered.
The model sets rough-in height, outlet placement and door swing, and can arrive late. Decide before rough-in begins.
A heated floor, extra niche or second valve can reset waterproofing and inspection order. Decide before demolition.
Bring a measured floor plan, room photos, must-haves and a budget range. Say whether the layout stays, the tub goes and what the shower should become. A clear scope helps make proposals comparable. Prudencio’s Georgia license is RBCO008765; ask for current insurance certificates.
For an older bathroom, 15–20% of the project cost is a practical reserve for concealed issues such as a soft subfloor, rotted joist or outdated plumbing. Reserve it for repairs, not upgrades.
Same-location vanity, toilet or floor-tile replacement often needs no permit; moving plumbing or electrical, rebuilding a shower pan or changing layout may require one. Requirements vary by jurisdiction and scope, so confirm before work starts.
Yes. Homeowners purchase all materials, and Prudencio helps with selections but never supplies them. Prudencio quotes labor only. Allow for material lead times and overage, and inspect deliveries early so shortages or damage do not delay the work.
Once tile and layout are locked, before demolition. Special orders can take weeks. Order 10–15% extra, confirm the dye lot, store boxes flat in a dry room and keep a spare box for future repairs.
Choosing finishes before confirming the layout. Settle the plan and budget first, including door clearance, then let the finishes support that plan.
Send your measurements and must-have list. Prudencio can help you plan material selections and provide a clear labor-only scope and quote.
Request a quote